MAJOR PROJECTS
BURN STANDARD
» Fabrication, assembly and welding of ONGC's B-57 and tubular
structures alongwith fabrication & erection of total out-fittingsof B-57
and B-131 Decks having piping of Carbon Steel, Stainless Steel,
Cupro-Nickel, NACE Carbon Steel & Incoloy.
HSL
» Fabrication, assembly and welding of EB jacket for ONGC
» Fabrication & erection of appurtenances for BH-22& BH 25 jackets.
» Fabrication and fittingout of IL Deck including Helideck in OPF yard
PGCIL
» Survey, Design, Supply. Execution of Civil , Erection and Testing of 800 KV
Transmission Line for PGCIL
|
 |
 |
HINDUSTAN SHIPYARD LTD.
Fabrication and Erection of Jacket & Appurtennaces for ONGC
Executed EB, BH-25 & BH-22 Jacket
Features
» Pipe Dia Upto 1.5 M (Thick 51 mm)
» Size : 25.5 M Length X 29.65 M Breadth X 83 M Height
» Accuracy 10 mm in Total Height of 83 M
|
 |
 |
FABRICATION AND FITTING OUT OF DECKS AT
Hindustan Shipyard Ltd.
Burn Standard Co. Ltd.
» Fabrication & Fitting out of Il Deck including Helideck in OPF
Yard - Lova Gardens Site
Fabrication & Assembly of ONGC B-57 along with total outfittings of
B-57 & B-131Decks
|
 |
 |
POWER GRID CORP. OF INDIA LTD.
Services for 800 KV Transmission Line
» 569 KM Long 800 KV Line (KISHENPUR TO MOGA)
» Single Circuit, Four Conductors Per Phase
» Joint Execution By MEL & Cobra Spa of Spain
» Total No. of Towers : 1465
» Structurals : 35,000 Mt
» Concrete : 60,000 Cu.Mtr.
|
 |
 |
|
|
|