MAJOR JOBS
BALCO
» Erection, testing & commissioning of hot & cold rolling mill
equipment mainlyimported from Russia, Germany and partly
indigenous - 7400 Tons with associated piping » Erection of Caster & Cold Rolling Mill thru FATA Hunter Italy
NALCO
» Civil, Structural and erection works incl. caster & Rolling mill foundation » Civil, Structural, equipment Erection, Electrics and Instrumentation
work for Green Anode Plant and Alumina & Crushed Bath Handling Plant
|
 |
 |
ANODE RODDING SHOP & ANODE HANDLING SYSTEM FOR
NATIONAL
ALUMINUM COMPANY LTD., ANGUL
(Capacity : 27 Anodes per Hour )
Consortium Partners: Syprim SA, France
Scope: Indigenisation of Drawings, Manufacturing of Equipment,
Erection & Commissioning
Major Equipment/Systems
» Automatic / Manual Loading & Unloading Stations
» Bath Removal Station
» Butt & Thimble Stripping
» Stem/Bracket Inspection Station
» Pin Graphite Coating
» Anode Rodding Station
» Cast Iron Recycling Shop
» Stem Bracket Assembly & Repair Shop
» Special Stacking Cranes
|
|
 |
GREEN ANODE PASTE PLANT
FOR
NATIONAL ALUMINUM
COMPANY LTD., ANGUL (Capacity: 29 Anodes per Hour)
Consortium Partners: KHD Humbolt Wedag AG, Germany
Scope : Indigenisation of Drawings, Manufacturing of
Equipment, Erection & Commissioning
Major Equipment/Systems
» Pneumatic conveying system
» Ball Mill, Hammer Mill, Roll Mills
» Liquid Pitch Storage & Hdlg. System
» Paste Plant
» Mixing & proportioning System
» Vibro Compactors
» Various Utilities
» Material Handling System
» Civil & Structural Work
» Electrical & Instrumentation Work
|
 |
 |
ALUMINA & CRUSHED BATH HANDLING SYSTEM
FOR
NATIONAL
ALUMINUM COMPANY LTD., ANGUL
(Capacity: 1000 TPH)
Consortium Partners: DUCON FLUID TRANSPORT, USA
Scope: Indigenisation of Drawings, Manufacturing of Equipment,
Erection & Commissioning
Major Equipment/Systems
» Belt Conveyors of approx. 1 Km
» Dedusting & Silo extracting system
» Silo top and bottom equipments
» Air slides & lifts
» Utilities
» Electrical & Instrumentation
» Structural fabrication
|
 |
 |
INTERNATIONAL ALUMINIUM PRODUCT LTD
Civil, Structural and Erection Works including Caster & Rolling
Mill Foundation
Excavation : 85,000 cu. mtr.
Concreting : 25,000 cu. mtr.
Brick work : 6,000 cu. mtr.
Roads : 6.10 Km
400 cu. mtr. water tank at
+30.0mtr.elevation.
Reservoir of 1,00,000 cu. mtr. capacity with LDPE lining.
Structural work : 3,400 MT
Sheeting work : 45,000 sq. mtr.
|
 |
|
|
|